Typical Payback Example
| Production Data : | |
| Strip Speed | |
| Strip Width | |
| Target Coat Wt. | 90GSM ; ± 5GSM |
| SAVINGS : | |
| Avg. Saving : | |
| Savings per minute : | |
| Savings per day : | |
| (A typical Payback can be achieved in a target frame of six months of continuous running.) | |
